Kehl St Fall Build 2022
Habitat for Humanity: Kitchener Waterloo Ontario Canada
Thursday, November 27, 2014
outside work is resuming
only the gable ends need closing
more walls
and then the snows came
Wednesday, November 26, 2014
roof sheeting should be done today
carrying back the lumber
our pond with a waterfall
today's group from HFH Waterloo region
building some walls
smoothing out the gravel
draining the pond
Tuesday, November 25, 2014
filling in around the doors and windows
walls and insulation
Monday, November 24, 2014
back after a snowy week. doing some basement work
painting the doors and trim has started
trying to get the roof done before it gets to cold
water water every where
more basement walls going up
continuing with the painting
outdoor work on hold for now
Tuesday, November 11, 2014
carrying over the roof sheeting
this may be our last lunch outside
basement windows
doing the window casings
lower half back done
Monday, November 10, 2014
working on the backside roofing
siding is continuing
Friday, November 7, 2014
water lines going in
Wednesday, November 5, 2014
putting up scaffolding
finishing some siding
doing the stonework
making progress
Tuesday, November 4, 2014
the day started outside until the rain started
and then the rains came so drywall started
heating being installed
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)