Kehl St Fall Build 2022
Habitat for Humanity: Kitchener Waterloo Ontario Canada
Tuesday, September 29, 2015
attaching the pipe for the air exchange
patching the floor
clean up before the move in
getting the air exchange ready
mixing the cement
getting ready to connect the water
putting up the firewall
cleaning up around the door
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment